Utility Coordination: coordinate municipal water shut off at the curb. Stop to isolate the incoming main service line.
Demo and Valve Removal: cutout failed main gate valve and decommissioned below grade meter set up.
Meter Elevation and Repiping: rework incoming main service above ground level install new main quarter turn ball valve ahead of meter and reset meter using proper meter couplings.
Backflow Prevention: install dual check valve assembly on the customer side of meter to prevent back siphonage into the public system per local code.
Thermal Expansion Protection: tea into cold waterline and install an expansion tank.
Testing and Restoration: restore main water, supply, pressure, test all new joints, bleed, air supply lines check for leaks verify proper expansion tank operation.
Warranty
2 years parts and labor
Need General Plumbing in Warwick?Evergreen Services serves Warwick and the surrounding area. Licensed, insured, and locally experienced.Get a Free Estimate