1. Power Isolation and Safety Inspection
Shut down dedicated electrical circuit breakers, feeding the tankless unit.
Inspect electrical wiring, terminal blocks, and heating vessel for signs of
thermal fatigue, loose connections, or moisture.
2. Inlet Strainer Inspection and Cleaning
Close cold water supply isolation valve, and relieve pressure.
Disconnect the cold water, inlet union in remove, clean, and flush the internal
mesh filter screen strainer of accumulated debris and sediment.
3. Chemical Descaling and Flush
Hook up descaling pump in circulation kit.
Circulate professional descaling solution through dual copper heating cylinders
for 45 minutes to dissolve accumulated calcium and mineral deposits.
Thoroughly flush the system with clean water prior to re-pressurization.
4. System Testing
Reassemble fittings, restore, water supply, check for proper flow, and bleed air
from lines.
Re-energize, electrical power, test operation across multiple hot water, fixtures,
and verify elimination of vibration/humming and proper temperature output.
Terms and Conditions
Preexisting Scale and Component Fatigue: this unit has been in service for three or four years without a flush heavy mineral accumulation can mask underline wire on O-rings, internal compression seals, and embraced copper joints
Leak Liability Exclusion: Evergreen is not responsible for pre-existing leaks. Structural degradation, cracked fittings or pinhole leaks in the copper heat exchanger vessels, or internal waterways that may become exposed or aggravated during the descaling, flushing, or repressed authorization process due to advanced scale erosion.
Warranty
No warranty on this service
More jobs in Warwick: View all Warwick jobs →
Learn more: Water Heater Repair, Install & Replacement in Warwick →