Ceiling Access Preparation: Enlarge existing ceiling inspection opening cleanly to appropriately 14 x 14 to establish clear working access to shower drain assembly and P-trap; lay down protective cloth in work area.
Drain Disassembly and Surface Prep: Remove strainer, unthread internal compression nut, and extract old rubber pipe gasket. Spin off bottom, lock, nut and friction washers, lift drain body from shower base, thoroughly scrape/clean all degraded, plumbers putty, old silicone, and mineral buildup from both sides of the shower base.
Reseal and Reassembly: Reseal drain flange with plumber’s putty. Reinstall rubber and fiber, friction washers, and torque lock not evenly to spec. Install new 2 inch DWV rubber compression gasket and tighten internal blocking nut.
Water Testing: Run continuous water flow to verify 100% watertight seal at the base collar and pipe connections before closing.
Terms and Exclusions:
This Plumbing estimate covers enlarging the ceiling opening for mechanical access only. Drywall patching, taping, texture, matching, and painting are excluded and will remain open for customer inspection/drying arranged separately.
Pricing assumes the existing drain housing, threads, P-trap, subfloor and shower base support are intact and structurally sound. If opening the ceiling reveals a cracked drain body, stripped threads, rotted, subfloor, or unsupported flexible shower pan, work will be paused in a separate change order reviewed with you prior to processing.
Warranty
1 year parts and labor
Need General Plumbing in Hopkinton?Evergreen Services serves Hopkinton and the surrounding area. Licensed, insured, and locally experienced.Get a Free Estimate